pole barn

wood: 500
door: 100
copies: 120
permit: 30
2 doors, 2 windows, wood 450
permit 450

starting from 8/9
3500 fill
lumber: 320
survey 750
loam top coat 200
braket hardware 1674
plastic/duct tape 110
concrete 1119
sona tubes 674
labor 560

458 electrical
300 wood
don labor: 100 
total: 11430

Labor Steve 90
Soil 100
Wood 200




Budget extra
trusses 6800
LVL beams 4500
Rental: 3000
Sheet metal 15500
vertical pillers: 2700
Windows: 1200
Plumbing: 300
Electrical: 900
hardware:  1000
labor  80 hours of Don x 10= 1520
labor other: 2400
waste oil heater:  2500
security cameras 1800
total: 44120


Spent
308 lowes hardware
825 don week 1
Saturday don 9:45-12:30?
Lowes gift card 2500?
Wood 140
Friday 19 additional hrs of other labor
Sawing 507
Gift card lowes 182.15
11560 siding and others from lowes
900 lights
64 practice lowes gift card
6900 trusses
11/2 I will stay within my budget of 44120 and not be mad or upset that I can't get everything I want
160 sawing down more wood
Don 10 hrs 45 mins
Mike 5 hours
It will take 2 weeks for bulk
Day 1
Don 9.5 hours
Adam and Brian 9.5
Parts 40
Parts bolts 100
Labor

Nelson 5 hrs
Adam 11 hrs
Brian 4.5 hours
Don 10 hrs
Armund 10.5 hours


Wood 600
Saw mill 243
Lowes gift card 5600